Project: Blind Faith
Client: Chevron
Description
3 (+1 future) 15k HT Horizontal Tree
Project Specs
- Water Depth: 6,950 ft
- Production Design Rate: 75 boe/day
- 5.5 mile gas tie-back to dedicated host
- 4-Slot Manifold with pigging loop
Project Results
Projects ongoing
Project Reference
Eric Hevle
Project Images
Click on a crop below to see a full picture.


